Summary

To ensure reliability, both the System Operator聽(NYISO) and the Load Serving Entity (Utility) need to聽maintain generation and distribution capacity to聽meet their peak demand obligations.聽 These costs are聽passed on to customers via demand-based charges,聽whether assessed as contribution to system聽coincident peak (ICAP tag) or individual monthly non-coincident peak (Demand Charge).聽 In聽ConEd, the聽Commercial System Relief Program (CSRP) aims to聽reduce peak demand at the network level by calling聽on customers to reduce energy use during their聽respective assigned call windows.

Four energy storage systems were installed in four different commercial buildings in Westchester, New York 鈥 one of the state’s first Virtual Power Plant demonstration projects. The project reduces electricity costs from ICAP and Demand Charges and participates in NYISO and ConEd demand response programs.

By participating in the聽CSRP program, the host earns incremental demand聽response revenue and the utility benefits from聽system relief.聽聽

 

Customer

GHP Realty

Location

Westchester, New York

Activation

Q2 2018

Capacity Size

1334 kW / 5336 kWh Total

Shared Savings Model

This project employs a shared-savings model. GHP (owner) and 911爆料网 split the utility bill savings and market revenues from the operation of the battery. GHP takes on little to no risk while receiving energy cost savings, and 911爆料网 retains a portion of the revenue in exchange for installing, maintaining, and operating the system.

Additionally, GHP gains a revenue stream in addition to the savings achieved with better building demand charge management.

READ MORE

Results

The energy storage system reduces utility costs and provides peak demand relief for the utility.

Con Edison, the electric utility for this site, provides funding for this system to reduce peak demand during certain windows of time through the Demand Management Program. By participating in the program, the project received an incentive from Con Edison, which reduced the total project cost.

READ MORE

Energy Cost Savings

~$1,490,000

cumulative

Developed in partnership with

鈥淲e have been extremely impressed with 911爆料网鈥檚 capabilities and the simplicity of the overall process. We are very excited to be one of the early adopters of energy storage in New York.